AUGUST 2014 list + confirmation + CALENDAR: AUGUST 17, 2014

First off ->  for the swimming pool light -> for the resident – YOU MAY want to

check the electrical – plug by the deck railing – next to the TREE – maybe

someone turned it off

Second :if it doesnt work then we have bad luck.. and i have already responded ..

now, that above said – below is the summary with some

detailed info:

[1] before this we did the deck and the drive way

RAILING ENTRANCE DECK -1

[2]  below is the list of people involved along side dates

and calendar + status of the job

 

[3] we have done our best. will contact lisa

and others as mentioned in the emails 

[4] we need time off – we have to finish off a project and

fly to a different continent

[5] we are done.. – read [3] and it does and will take time

.. (jesus also was doing the cabinets)

[6] we have to go and finish off the stuff that is called our day

jobs 🙂

and after that i have a mom-job – and a son job and

a company job and i have a husband

who is not happy either .. 🙂

 but this is all my problem not someone else’s .

. i am just saying so you know human limitations..

[7] i can check my email and blog and stuff but not before 3-4

weeks from now..

ps: ajay will be busy with his work and his personal stuff as

well..

pps: i have left a messages for lisa.. but they are not like me,

who call instantly.. we have american, not indian limitations

🙂 be it the contractors or lisa or john or anyone for that

matter..

 

 

 

 

house-of-olga-shulman-lednichenko-contractors-july-31-august-1-august-2-august-8-till-august-15-2014.jpg

ITEM AREA DESCRIPTION CONFIRMATION IMAGES
YARD BACK YARD CLEANUP FIXED / COMPLETED http://tinyurl.com/BACKYARDPHOTOS
YARD FRONT YARD CLEAN UP FIXED / COMPLETED http://tinyurl.com/FRONTYARDIMAGES
YARD UNDER DECK AREA UNDER NEATH DECK FIXED / COMPLETED
Planters built and hung fence balcony deck etc have to use the ENTIRE wood lying udnerneath the dck FIXED / COMPLETED http://tinyurl.com/woodreadyforsatging
Molding on the kitchen cabinets KITCHEN CABINETS FIXED / COMPLETED
Wall above master bathroom tub masterbath above window sheet rock work FIXED / COMPLETED
Master toilet door master bathroom louvered bifold door is off FIXED / COMPLETED
Door from carport to house first floor replace door and put old doors in the shed FIXED / COMPLETED
Door for laundry room first floor replace door and put old doors in the shed FIXED / COMPLETED
Bathroom cabinets/drawers first floor warped cabinets walls and missing front face
Stove top burner kitchen stove One of the burner wasnt working FIXED / COMPLETED
Chicken wire fence bundles lying all over the house put these by the back fence so vines can climb – if not put it in shed, if not discard it FIXED / COMPLETED anthony rafael
Front door upstairs second floor door is weathered FIXED / COMPLETED
Sliding glass doors 1st and 2nd floor sliding doors not working properly FIXED / COMPLETED
Carport light 1st Floor by the back entry door under carport lights not working.. FIXED / COMPLETED
fence pickets yard take down and build planters and install FIXED / COMPLETED
Shelf in large bedroom downstairs FIXED / COMPLETED
FAN in large bedroom first floor fan isnt working – fix that FIXED / COMPLETED
YARD DEBRIS yard FIXED / COMPLETED
PREVIOUS LIST DONE BY JESUS SEE BELOW http://tinyurl.com/FIXEDBYJESUSAUGUST3
NAILS IN RAILROAD STEPS BACKYARD STEPS COMPLETED BY JESUS ON AUGUST 2-2014
FOUNDATION CRACK CARPORT COMPLETED BY JESUS ON AUGUST 2-2014
WINDOW FIRST FLOOR ENTRT WINDOW BY DOOR COMPLETED BY JESUS ON AUGUST 2-2014
BASE BOARDS UTILITY ROOM COMPLETED BY JESUS ON AUGUST 2-2014
ELECTRICAL OUT LET IN BEDROOM FIRST FLOOR LARGER BR COMPLETED BY JESUS ON AUGUST 2-2014
ELECTICAL WIRE FIRST FLOOR LARGER BR COMPLETED BY JESUS ON AUGUST 2-2014
EXPOSED WIRE IN YARD OUTSIDE 1ST FLOOR LARGE BR WINDOW COMPLETED BY JESUS ON AUGUST 2-2014
GRANITE BACKSPLASH KITCHEN COMPLETED BY JESUS ON AUGUST 2-2014
WALKWAY STEPS YARD WALKWAY COMPLETED BY JESUS ON AUGUST 2-2014
SHED VENEER COMPLETED BY JESUS ON AUGUST 2-2014
RECAULK BATHTUB FIRST FLOOR COMPLETED BY JESUS ON AUGUST 2-2014
REMOVE YELLOW MARK FROM BATHTUB FIRST FLOOR COMPLETED BY JESUS ON AUGUST 2-2014
Jesus has been paid jesus didnt finish the cabinets hired new contractor anthony rafael lamas for this and other items

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s