HOUSE OF OLGA – FROM 1998 FEBRUARY TILL DATE -SUMMARY OF REMODELLING

THERE ARE 2 AREAS IN THE HOUSE :

[A] OUTSIDE OF THE HVAC

[B] INSIDE THE HOUSE


On the Outside areas:

[a] Deck is almost new – almost because good boards were not discarded.

Deck was remodelled in 2014 JULY , so at this point of time. the deck is 1 year old

photos below have time stamps – click on the photos for a larger view

IMG_0657 deck deck JUNE 18 2015 photos johnny-bonscar-ajay-mishra-materials-and-labor-remodelling-208 -westhaven-drive-ajay-olga-mila1404416183049_IMG_20140703_143521_9841404410193343_IMG_20140703_125535_7861404498326823_IMG_20140704_132402_1821404501893370_IMG_20140704_142428_8431404505783498_IMG_20140704_152906_5291404512157752_IMG_20140704_171523_8181404507407784_IMG_20140704_155615_4171404840490410_IMG_20140708_122347_7971404846721183_IMG_20140708_141042_9091404857716714_IMG_20140708_155315_0681404857717101_IMG_20140708_155336_019

[b] The Swimming Pool -was redone – from scratch – replastered – in July 2014 – Today is August 17, 2015 – so the pool is 1 year 1 month old. 

image (7)

shown above is a picture of the contractor – who re plastered the pool in 2014 June.

now, here is how the pool looks like AFTER this replastering


[c] THE FENCE IS RELATIVELY NEW – the flower boxes on the fence wwere done in august 2014

[d] the RETAINING WALL was done in JUNE 2015

RAFAEL DIDNT DO IT.. SO ROBERT CONNOR – CRAIG LIST CONTRACTOR – DID THE RETAINING WALL IN JUNE 2015 AND HE ALSO DID THE WALL BY THE BACK SIDING OF THE HOUSE

https://lednichenkoolgashulman.files.wordpress.com/2015/08/208-westhaven-drive-retaining-wall-done-by-robert-ross-in-june-2015.jpg?w=562


now, the part b is the INSIDE areas: the HVAC area :


There are TWO floors in the house – Downstairs and Upstairs:


DOWNSTAIRS:

[1] Bigger bedroom –> the floor of the room – wood – was done in 2006 – so, as this time of writing its 9 years old .The paint is 2 years old. The electrical and the fixtures – were done in 2015 – so, its recent


[2] Hall way – the hall way floor – wood – was done in 2006 – so, 9 years old. Paint is 2 years old.


[3] Utility room – done in 2015 – June – so,its onemonth old – the fixture – the insulation, sheet rock, etc. and the baseboards.. also in the utility room a  new light fixture was installed -> https://milahouserepairs.wordpress.com/2015/05/18/utility-room-and-bedroom-light-its-in-see-photos-thanks/

The water heater was installed – its new – with a 9 year warranty – on September 11, 2013. So, at this time, i.eas of august 17, 2015 – its less than 2 year old.. 1 year 11 month old – precisely

actualy the date was September 13  not February 2013 – as shown here

NEW WATER HEATER INSTALLED - ON FEBRUARY 2013 - BY BOB RUSSEL OWNER OF RMS PERCY AAUSTIN TX USA

in JUne 2015 – ROBERT CRAIG LIST CONtractor – did the Return air valve –


The air handler for the AC units – was done in 2011 – so its 4 year old as of today.. august 17 2015


[4] The Bathroom – downstairs:

IMG_0616 may 27, double sink vanity bathroom - vessel sink - in progress IMG_0618 may 27, double sink vanity bathroom - vessel sink - in progress IMG_0617 may 27, double sink vanity bathroom - vessel sink - in progress -

MILA-OLGA-AJAY-JOHNNY-ROBERT - DOUBLE SINK VANITY - DESIGN - OFFSET - AND SYMMETRY

  • [a] the Floor – is of marble – these tiles are italian – crema marfil – marble tiles – the marble floor was done ON august 13, 2015 – so, its 4 days old.

IMG_0699 JUNE 18 2015 DOWNSTAIRS BATHROOM PICTURES johnny-bonscar-ajay-mishra-materials-and-labor-remodelling-208 -westhaven-drive-ajay-olg IMG_0698 JUNE 18 2015 DOWNSTAIRS BATHROOM PICTURES johnny-bonscar-ajay-mishra-materials-and-labor-remodelling-208 -westhaven-drive-ajay-olg

  • [b] The Double Sink Vanity – is of walnut wood – even the inside is walnut wood.. the drawers ie – this was done in MAY 2015 – the sinks are new, and so are the faucets – the plumbing on rthe vanity is also new.. even the sheet rock behind is new .
  • [c] the Toilet is 6 years old
  • [d] the Mirrors – there are two mirrors – were purchased and installed in July 2014 – so, there are one year old.
  • [e] The Light fixtures – were purchased – new – and installed -in June 2015 – so, they are  less than 2 months old.

  • [f] The bathtub – faucets and drains, tub sprout , the CA register  etc were – purchased and installed – new in August 2014 .. so,they are about an year old.
  • [G] miscellaneous items – punch list there are about 53 small items in the punch list requested by the tenant -in July august 2014 -0 there were all compeletd – here is some itemized summary and details alongside receipts –> https://lednichenkoolgashulman.wordpress.com/tag/house-of-olga-materials-list/
  • NEW CARPORT DOOR –> INSTALLED BY AUSTINE – COLLAZO – CONTRACTOR – IN AUGUST 2014

house of olga shulman lednichenko carport door

NEW ROOF – Rood was done in march 15, 2012  – this is a brand new roof – so 3 year old roof..

This roof was done by clear choice roofing and there is a 25 year warranty on it 

house-roof-contract-and-invoice-roof-2
ROOF    PROOF OF NEW ROOF IN MARCH 2012 VENDOR = CLEAR CHOICE ROFFING, AUSTIN TEXAS SEE CERTIFICATE AND INVOICE BELOW: Back Roof HOUSE OF BELKA - OLGA -SHULMAN LEDNICHENKO - OLGA LEDNICHENKO'S HOUSE SEE ATTACHED COPIES OF CONTRACT AND PAID INVOICE. MATERIAL=OWENS CORNING 3-TAB SINGLES. COLOR=AMBER, SKY LIGHT REPLACED AND SIDING REPAIRED SEE ATTACHED COPIES OF CONTRACT AND PAID INVOICE. MATERIAL=OWENS CORNING 3-TAB SINGLES. COLOR=AMBER, SKY LIGHT REPLACED AND SIDING REPAIRED Front Picture HOUSE OF BELKA - OLGA -SHULMAN LEDNICHENKO - OLGA LEDNICHENKO'S HOUSE

SEE ATTACHED COPIES OF CONTRACT AND PAID INVOICE. MATERIAL=OWENS CORNING 3-TAB SINGLES. COLOR=AMBER, SKY LIGHT REPLACED AND SIDING REPAIRED

PROOF - INVOICE OF ROOF REPLACEMENT + SKY LIGHT REPLACEMENT + SIDING REPAIR - TOTAL COST = $ 4843 - DATE = MATCH 15 2012

PROOF – INVOICE OF ROOF REPLACEMENT + SKY LIGHT REPLACEMENT + SIDING REPAIR – TOTAL COST = $ 4843 – DATE = MATCH 15 2012

HOUSE ROOF INVOICE PROOF 1

HOUSE ROOF INVOICE PROOF 1

HOUSE ROOF CONTRACT AND INVOICE ROOF 2

HOUSE ROOF CONTRACT AND INVOICE ROOF 2

//

Danielle Batiste <clearchoicescheduler@gmail.com>

AttachmentsMay 22

to me

2 Attachments

Preview attachment 208 Westhaven Drive Contract006.jpg

208 Westhaven Drive Contract006.jpg

208 Westhaven Drive Invoice005.jpg

Ajay Mishra <am>

May 22 2014

to Danielle
 IS THERE A NEW ROOF AT MY HOUSE U GUYZ DID ?
my property manager, couldnt confirm.
please let me know

thanks

as discussed, ould you please get me a letter from your company inidcating that you guys on march, 2012, replaced with a new roof

On Thu, May 22, 2014 at 12:10 AM, Danielle Batiste <clearchoicescheduler@gmail.com> wrote:

Danielle Batiste <clearchoicescheduler@gmail.com>

May 22

to gavin, me

Clear Choice Roofing <clearchoiceroofing@hotmail.com>

AttachmentsMay 22

to me, Danielle
Mr. Mishra,Please find the requested letter and a copy of your contract and paid invoice.Kindest Regards, Rhonda Vaughn Clear Choice Roofing “Clearly The Right Choice” Gavin Weathersby www.clearchoiceroofingatx.com Owner/CEO 9065 Jollyville Rd Ste 203C Austin Texas 78759Office 512-712-4906 Fax 512-712-4907

THE ABOVE – MOSTLY COVERS THE ROOF AND THE DOWNSTAIRS :

REGARDING THE UPSTAIRS: IN REVERSE CHRONOLOGICAL THE FOLLOWING REMODELLING WAS DONE:


[1] MASTER BATHROOM – this was done in May June 2015 – this is recent – new fresh paint – contractor name: alfredo –

208 westhaven drive 78746 house ofolga shulman lednichenko master bathroom masterbathroom marble bathroom sexy howz 2

208 westhaven drive 78746 house ofolga shulman lednichenko master bathroom masterbathroom marble bathroom sexy howz 2

208 westhaven drive 78746 house ofolga shulman lednichenko master bathroom masterbathroom marble bathroom sexy howz has jacuzzi marble italin marble on floors and walls

208 westhaven drive 78746 house ofolga shulman lednichenko master bathroom masterbathroom marble bathroom sexy howz has jacuzzi marble italin marble on floors and walls

208 westhaven drive 78746 house ofolga shulman lednichenko master bathroom masterbathroom marble bathroom sexy howz

208 westhaven drive 78746 house ofolga shulman lednichenko master bathroom masterbathroom marble bathroom sexy howz

208 westhaven drive 78746 house ofolga shulman lednichenko master bathroom masterbathroom marble bathroom sexy howz 5

208 westhaven drive 78746 house ofolga shulman lednichenko master bathroom masterbathroom marble bathroom sexy howz 5

208 westhaven drive 78746 house ofolga shulman lednichenko master bathroom masterbathroom marble bathroom sexy howz 4

208 westhaven drive 78746 house ofolga shulman lednichenko master bathroom masterbathroom marble bathroom sexy howz 4

208 westhaven drive 78746 house ofolga shulman lednichenko master bathroom masterbathroom marble bathroom sexy howz 3

208 westhaven drive 78746 house ofolga shulman lednichenko master bathroom masterbathroom marble bathroom sexy howz 3

click on images for larger pictures 


ALL the things that were done to the house since the house was purcahsed by ajay mishra – the landlord – in 1998 february – will be listed shortlywith photos and time stamps:

for now, here is whats new

[a] in LIVING AREA -> everything including the sheet rock is new – everything means

  • GRANITE FLOORS ARE NEW – NEW AS IN DONE IN 2001 – 2002 –
  • there was a SUNKEN LIVING PIT –
  • AND A FIRE PLACE
  • AND A SAUNA – WHERE THE HALF BATH IS NOW –
  • Those kitchen windows – are 10 year old.. theye were bought NEW – and installed new in 2001 – 2002
  • everything – means – everything you see including the wriing, the electical , the plumbing the sheet rock, the floors – wood and granite – the lights, the windows, the cabinets, the island, the appliances are all ,from 2001 – 2002 .. yeah even the COLUMNS – there was a LOFT – and the sheet rock and EVEN THE CATHEDRAL CEILINGS TONGUE AND GROOVE PINE – had to be sand blasted – because they were stained DARK..

https://eanesschoolwestlakehouserent.files.wordpress.com/2014/04/kitchen-n-living-room1.jpg

these track lights were also new – installed in 2001 – 2002


photos of remodelled to the STUDS – will be posted shortly..

AND YES, the master bath room is also, completely chnaged from when the house was bought in february 1998:

here are the changes in the master bathroom


[a] SEPARATE SHOWER – there was a shower -tub combo.. before

[b] Jaccuzi – this was a bathtub – with a shower on the wall.. so even the plumbing is new. well, new as in 2001 -2002 

[c] The Half bath – this was a sauna before 

[d] the marble you see all over on the floors and walls- was not there – instead it was ceramic tiles..

[e] even the sheet rock in the master bath room is new – too bad the tenants painted over the faux finishes – they were beautiful

[f] the window that you see in masterbathroom above the Jaccuzi – was not there – it was installed -in 2002 


the ONLY thing in the masterbathroom that wasnt changed – is -> the vanity – and that mirror.. thats all

208 westhaven drive 78746 house ofolga shulman lednichenko master bathroom masterbathroom marble bathroom sexy howz has jacuzzi marble italin marble on floors and walls

208 westhaven drive 78746 house ofolga shulman lednichenko master bathroom masterbathroom marble bathroom sexy howz has jacuzzi marble italin marble on floors and walls

and yes, the roof – in the entire master area – the bedroom and the master bath room was stained dark brown – it was sand blasted – costed $5900 in 2001 to do that sand blasting of the entire roof of the second floor – ie. of the upstairs, cathedral ceilings, tongue and groove pine.

  • fyi – the old kitchen has plywood cabinets – and it was only 7 feet by 8 feet – 🙂 and theere was ONLY one window – that was 3 by 4 feet window

yes, even the STAIR CASE IS NEW – ie in 2001 – 2002 


yes, there are some things that are still the same old – > and they are 

[1] the huge glass doors, the sliding glass doors are still the same. in bedrooms and the living room.. 

[2] the smaller bedroom downstairs – did not have a door – before – and neither did it have any window – it was changed in 2007

[3] the foundation is the same and the electrical junctiona box is the same old..


so, in summary you can say


[a] ROOF IS 3 YEAR OLD

[B] POOL AND DECK IS ONE YEAR OLD

[C] INSIDE – FIRST FLOOR IS – 1 YEAR OLD –

[D] INSIDE SECOND FLOOR IS 13 YEAR OLD


Advertisements

One thought on “HOUSE OF OLGA – FROM 1998 FEBRUARY TILL DATE -SUMMARY OF REMODELLING

  1. Pingback: Someone just viewed: Sunday, October 15, 2017 TILAK | THE MAN. THE MIND. THE MACHINE

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s